Version 1 (modified by 18 years ago) ( diff ) | ,
---|
Sanbox Switch
Each two-node sanbox has a 16 port Netgear GS716T Gigabit Smart Switch with the FQDN of sw-sbXX.orbit-lab.org (where XX is sanbox number 01-09). FOr each of the switches ports 1-4 are reserved for CM subnet, ports 5-8 for sanbox control subnet while ports 9-12 are reserved for sanbox data subnet. Ports 13-15 are assigned to network managemtn while port 16 is, as in the case of other Orbit switches, us uplink trunk.
Switch Configuration
Most important part of the confration are the two tables dealing with VLANs so that if you check the switch status it shows something like this for sanbox 1 (sw-sb01):
IEEE 802.1Q PVID Table
Port | PVID | Port | PVID | Port | PVID | Port | PVID |
01 | 3 | 02 | 3 | 03 | 3 | 04 | 3 |
05 | 11 | 06 | 11 | 07 | 11 | 08 | 11 |
09 | 12 | 10 | 12 | 11 | 12 | 12 | 12 |
13 | 1 | 14 | 1 | 15 | 1 | 16 | 1 |
IEEE 802.1Q VLAN Settings
VLAN ID | Member Port | |||||||||||||||
01 | 02 | 03 | 04 | 05 | 06 | 07 | 08 | 09 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | |
1 | U U U U | |||||||||||||||
3 | U | U | U | U | T T T T | |||||||||||
11 | U | U | U | U | T | T | T | T | ||||||||
12 | U U U U T T T T |
Configuration is done under the VLAN entry.
Note: the upstream switch has to have untagged port for SmartWizard to even see the unconfigured switch. Once new switch is configured (mainly trunk ports) the upstream switches port should be configured so that it provides propper trunking.
Attachments (3)
-
SmartWizard.jpg
(115.8 KB
) - added by 18 years ago.
Initial switch setup with Smartwizard
- 716T-2.jpg (50.8 KB ) - added by 18 years ago.
- 716T-3.jpg (106.8 KB ) - added by 18 years ago.
Download all attachments as: .zip