Changes between Version 8 and Version 9 of Other/Summer/2020/Bees


Ignore:
Timestamp:
Jul 13, 2020, 3:17:42 AM (4 years ago)
Author:
ZHENZHOU
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Other/Summer/2020/Bees

    v8 v9  
    1919
    2020== Week 1 Activities ==
     21\\ *Study the work was done previously in this project
     22\\ *Literature review on related papers
     23[]
    2124
    2225== Week 2 Activities ==
     26\\ *Built a prototype to measure the magnetic field strength
     27\\ *Developed an understanding of the functionalities for each pin in MSP430
     28[]
    2329
    2430== Week 3 Activities ==
     31\\ *Make the PIP Tag collect the data and transmit them to a nearby computer
     32\\ *Familiarize with Eagle software and went through tutorials to build simple projects
     33[]
    2534
    2635== Week 4 Activities ==
     36\\ *Magnetometer sensor is being used by Prof. Rich Howard
     37\\ *Prof. Rich Howard has completed the solar power unit
     38\\ *Finished searching all the components needed for building the schematic design for PCB
     39[]
    2740
    2841== Week 5 Activities ==
     42\\ *Professor Martin has deployed feeders in Hort Farm
     43\\ *Walkthrough on small details of other components on the PCB board.
     44[]
    2945
    3046== Week 6 Activities ==
     47\\ *The magnetometer is working as required
     48\\ *Eagle Libraries added and the PCB schematic design updated
     49[]
    3150
    3251== Week 7 Activities ==