Changes between Version 8 and Version 9 of Other/Summer/2020/Bees
- Timestamp:
- Jul 13, 2020, 3:17:42 AM (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Other/Summer/2020/Bees
v8 v9 19 19 20 20 == Week 1 Activities == 21 \\ *Study the work was done previously in this project 22 \\ *Literature review on related papers 23 [] 21 24 22 25 == Week 2 Activities == 26 \\ *Built a prototype to measure the magnetic field strength 27 \\ *Developed an understanding of the functionalities for each pin in MSP430 28 [] 23 29 24 30 == Week 3 Activities == 31 \\ *Make the PIP Tag collect the data and transmit them to a nearby computer 32 \\ *Familiarize with Eagle software and went through tutorials to build simple projects 33 [] 25 34 26 35 == Week 4 Activities == 36 \\ *Magnetometer sensor is being used by Prof. Rich Howard 37 \\ *Prof. Rich Howard has completed the solar power unit 38 \\ *Finished searching all the components needed for building the schematic design for PCB 39 [] 27 40 28 41 == Week 5 Activities == 42 \\ *Professor Martin has deployed feeders in Hort Farm 43 \\ *Walkthrough on small details of other components on the PCB board. 44 [] 29 45 30 46 == Week 6 Activities == 47 \\ *The magnetometer is working as required 48 \\ *Eagle Libraries added and the PCB schematic design updated 49 [] 31 50 32 51 == Week 7 Activities ==