  • Other/Summer/2020/Bees

    v12 v13  
    4040\\*Study the work was done previously in this project
    4141\\*Literature review on related papers
    42 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2001.pdf Presentation 01]
     42\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2001.pdf Presentation 01]
    4343
    4444== Week 2 Activities ==
    4545\\*Built a prototype to measure the magnetic field strength
    4646\\*Developed an understanding of the functionalities for each pin in MSP430
    47 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2002.pdf Presentation 02]
     47\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2002.pdf Presentation 02]
    4848
    4949== Week 3 Activities ==
    5050\\*Make the PIP Tag collect the data and transmit them to a nearby computer
    5151\\*Familiarize with Eagle software and went through tutorials to build simple projects
    52 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-03.pdf Presentation 03]
     52\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-03.pdf Presentation 03]
    5353
    5454== Week 4 Activities ==
     
    5656\\ *Prof. Rich Howard has completed the solar power unit
    5757\\ *Finished searching all the components needed for building the schematic design for PCB
    58 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-04.pdf Presentation 04]
     58\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-04.pdf Presentation 04]
    5959
    6060== Week 5 Activities ==
    6161\\ *Professor Martin has deployed feeders in Hort Farm
    6262\\ *Walkthrough on small details of other components on the PCB board.
    63 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-05.pdf Presentation 05]
     63\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-05.pdf Presentation 05]
    6464
    6565== Week 6 Activities ==
    6666\\ *The magnetometer is working as required
    6767\\ *Eagle Libraries added and the PCB schematic design updated
    68 \\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2006.pdf Presentation 06]
     68\\[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2006.pdf Presentation 06]
    6969
    7070== Week 7 Activities ==