Changes between Version 11 and Version 12 of Other/Summer/2020/Bees


Ignore:
Timestamp:
Jul 13, 2020, 3:40:45 AM (4 years ago)
Author:
ZHENZHOU
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Other/Summer/2020/Bees

    v11 v12  
    99**What we know:
    1010**
    11 \\Bees use Earth’s magnetic field for navigation and orientation
    12 \\Explore if RF(Radio Frequencies) has any impact on the behaviors of the bees
     11\\   *Bees use Earth’s magnetic field for navigation and orientation
     12\\   *Explore if RF(Radio Frequencies) has any impact on the behaviors of the bees
    1313
    1414\\
    1515**What we have done so far:
    1616**
    17 \\A Method to conduct the experiment
    18 \\A prototype for magnetic field sensing (using a magnetometer)
    19 \\Basic equipment design: camera, feeder pump
     17\\   *A Method to conduct the experiment
     18\\   *A prototype for magnetic field sensing (using a magnetometer)
     19\\   *Basic equipment design: camera, feeder pump
    2020\\[[Image()]]
    2121
     
    3838
    3939== Week 1 Activities ==
    40 *Study the work was done previously in this project
    41 *Literature review on related papers
    42 *[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2001.pdf Presentation 01]
     40\\*Study the work was done previously in this project
     41\\*Literature review on related papers
     42\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2001.pdf Presentation 01]
    4343
    4444== Week 2 Activities ==
    45 *Built a prototype to measure the magnetic field strength
    46 *Developed an understanding of the functionalities for each pin in MSP430
    47 []
     45\\*Built a prototype to measure the magnetic field strength
     46\\*Developed an understanding of the functionalities for each pin in MSP430
     47\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2002.pdf Presentation 02]
    4848
    4949== Week 3 Activities ==
    50 *Make the PIP Tag collect the data and transmit them to a nearby computer
    51 *Familiarize with Eagle software and went through tutorials to build simple projects
    52 []
     50\\*Make the PIP Tag collect the data and transmit them to a nearby computer
     51\\*Familiarize with Eagle software and went through tutorials to build simple projects
     52\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-03.pdf Presentation 03]
    5353
    5454== Week 4 Activities ==
     
    5656\\ *Prof. Rich Howard has completed the solar power unit
    5757\\ *Finished searching all the components needed for building the schematic design for PCB
    58 []
     58\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-04.pdf Presentation 04]
    5959
    6060== Week 5 Activities ==
    6161\\ *Professor Martin has deployed feeders in Hort Farm
    6262\\ *Walkthrough on small details of other components on the PCB board.
    63 []
     63\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project-05.pdf Presentation 05]
    6464
    6565== Week 6 Activities ==
    6666\\ *The magnetometer is working as required
    6767\\ *Eagle Libraries added and the PCB schematic design updated
    68 []
     68\\*[https://www.orbit-lab.org/attachment/wiki/Other/Summer/2020/Bees/Bee%20Project%20-%2006.pdf Presentation 06]
    6969
    7070== Week 7 Activities ==