Changes between Version 149 and Version 150 of Internal/Rbac/OrbitRbacDesign
- Timestamp:
- Sep 20, 2006, 5:15:59 PM (18 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Internal/Rbac/OrbitRbacDesign
v149 v150 2 2 == ORBIT RBAC Design == 3 3 === Previous Work === 4 Siswati Swami's recent "Requirements Specifications for ORBIT Access Control" [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/Specs2.pdf Swa06]] contains an analysis of each of the roles in which an ORBIT user might act when working on an ORBIT project. The analysis is based on use cases [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/IC_TECH_REPORT_200131.pdf NW01]] and [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/fernandez97determining.pdf FH97]] , and the specification contains a permissions matrix with access granted or not granted for each role and resource combination.4 Siswati Swami's recent "Requirements Specifications for ORBIT Access Control" [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/Specs2.pdf Swa06]] contains an analysis of each of the roles in which an ORBIT user might act when working on an ORBIT project. The analysis is based on use cases [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/IC_TECH_REPORT_200131.pdf NW01]] and [[http://orbit-lab.org/attachment/wiki/Internal/Rbac/RbacResources/fernandez97determining.pdf FH97]]. The specification contains a permissions matrix with access granted or not granted for each role and resource combination. 5 5 === Design Issues === 6 6 Role-based access control for ORBIT has to allow roles to be expressed in a project context. That is, a specific project would be constraint on Project Leader and Project Member roles for example. The primary resources are project-owned data.