Changes between Version 79 and Version 80 of Internal/NodeIssues


Ignore:
Timestamp:
Oct 10, 2007, 5:10:29 PM (17 years ago)
Author:
seskar
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Internal/NodeIssues

    v79 v80  
    33= Nodes with NEWer power supplies =
    44
    5 Power Supply Over hauling Stage 2. The first direct replacement didn't go so well. We're now changing to 200Watt external power supplies. This requires some significant modification of the node and the hanging assembly.
     5Power Supply Over hauling Stage 2. The first direct replacement didn't go so well. We're now changing to 200 W FSP external power supplies. This requires some significant modification of the node and the hanging assembly.
    66
    7 As such I'm adding a NEWer Power supply Replacement diagram for nodes with the 200Watt FSP Power supplies.
    8 
    9 Starred units have 180Watt SPI power supplies.
     7Starred units have 180 W SPI power supplies.
    108
    119''' When using the VELCRO on the bottom of the power supply, place them over the hexagonal bolt holes. If we have to swap the power supply, this will ensure the VELCRO on the hat is in the "correct" place. '''