Changes between Version 5 and Version 6 of Internal/Maintenance


Ignore:
Timestamp:
Nov 6, 2013, 4:04:48 PM (11 years ago)
Author:
msherman
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Internal/Maintenance

    v5 v6  
    3636 1. Run 3 times, then swap team names.
    3737----
     38
     39'''Server Room Cleanup'''[[BR]]
     401. Install Patch Panel for coax
     411. Install D rings to All racks
     421. Add network bundle to far wall
     431. Add two sets of network wall ports
     441. Add 2 48 port keystone panels
     451. Terminate existing bundle
     461. Where possible, route network to right of rack, power to left
     471. Clean up power routing, eliminate hanging power strip
     48
     49'''Grid Room maintainence/upgrade'''[[BR]]
     501. Replace Sandbox Rack PDU
     512. Continue running coax and ethernet to server room
     52
     53
     54
     55
     56
     57
     58
     59
     60
     61
     62