Changes between Version 18 and Version 19 of Hardware/dInfrastructure/qPowerMeasurment


Ignore:
Timestamp:
Aug 27, 2013, 7:01:57 PM (11 years ago)
Author:
pavan717
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Hardware/dInfrastructure/qPowerMeasurment

    v18 v19  
    114114[[BR]]
    115115
    116 The chart shown above displays the results of the first 12 breaker switches mapped to their proper outlets.  As shown above except for breaker switch 12, switches 1-11 have total of 3 outlets connected to each of them. This is because outlets 2, 6, 10, 14, 35 and 36 are not connected to any of the first 12 breaker switches.  Total of 24 nodes are connected to those outlets that will be mapped to the remaining 22 breaker switches.
     116To view the full results of mapping the first 12 breaker switches download {{{Mapping Data.xlsx}}} from the attachments. The chart shown above displays the results of the first 12 breaker switches mapped to their proper outlets.  As shown above except for breaker switch 12, switches 1-11 have total of 3 outlets connected to each of them. This is because outlets 2, 6, 10, 14, 35 and 36 are not connected to any of the first 12 breaker switches.  Total of 24 nodes are connected to those outlets that will be mapped to the remaining 22 breaker switches.
     117
     118'''Future Work:'''
     119
     120 As this project continues 3 more sensors circuits will be required to cover rest of the ORBIT grid and the remaining 22 breaker switches will have to be mapped to the proper outlets.  Once the entire ORBIT grid is connected, the power 
     121
    117122